What is ETL certification


ETL is the abbreviation of ETL Testing Laboratories Inc. It was founded by Thomas Edison in 1896 and is an NRTL (Nationally Recognized Laboratory) accredited by OSHA (Federal Occupational Safety and Health Administration). After more than 100 years, the ETL mark has been widely recognized and accepted by major retailers in North America, and enjoys a high reputation like UL. ETL inspection mark Any electrical, mechanical or electromechanical product with an ETL inspection mark indicates that it has been tested and complies with relevant industry standards.


ETL certification mark

ETL certified product type

Electrical, mechanical or electromechanical products


As long as any electrical, mechanical or electromechanical product carries the ETL mark, it indicates that the product has reached the minimum requirements of the generally recognized product safety standards in the United States and Canada, and it has been tested to meet the relevant product safety standards. ETL also requires that its production site has been inspected, and the applicant agrees to conduct regular follow-up inspections to its factory thereafter to ensure that the product always meets this requirement.


Certification information provided


There are currently two ways to obtain an ETL certificate, one is to transfer the CB test report, and the other is to apply directly. The required materials are as follows:


1. Application Form

2. Copy of CB test certificate (not required for direct application)

3. Copy of CB test report (not required for direct application)

4. Samples (4-8 pieces)

5. Other related test results and product data, such as product descriptions, photos, component lists, product performance and specifications, circuit schematics, etc. (If you transfer through the CB report, you need to conduct a difference test)


Factory inspection

Factory inspections are required before ETL issuance, and subsequent factory inspections will be carried out from time to time every quarter. In addition to the factory inspection fees, the fee for the certificate and license must be paid quarterly.


Certification cycle

Routine is 3-4 weeks, can be expedited